Burst Water Pipe Area 25C *RESOLVED*

17-Dec-2016 | 14:57

Burst water pipe in Area 25C close to New Vision Secondary School. Basikolo's compound neighbor to the Nankhwere's

Kuno ku Dowa vuto ndi kolite ya madzi

17-Dec-2016 | 13:41

Ku Dowa madzi a pampopi mukumapezeka zinthu zosakhala bwino zomwe zikupereka chiopsezo pa moyo wathu

Pempho kuno ku Area 36 atikonzere bridge

16-Dec-2016 | 16:08

Chonde brige yolumikiza area 36 ndi tumbwe,payelea ndi kupita kwamitengo,akufuna padzafe kaye munthu? nafenso anthu khalidwe loba mitengo silabwino. Hardson Lefan.champhepete village (area 36,LL).

Hospital Project Abondoned in Machinjiri

16-Dec-2016 | 05:11

I would like to report that a hospital project was abandoned here in Machinjiri soon after the 2014 General elections. The project was initiated by John Bande but since he lost to the incumbent Noel Masangwi, there has been no progress. I personally have no direct means to reach out to the Member of Parliament but I know a number of people in the community are complaining about this. Please, we really need this project to pick up.

Electricity Problem Chitawira

15-Dec-2016 | 17:17

Here in Chitawira specifically our house number CW169 we usualy have no power because of a persistent problem with a pole close by where sparks are observed. we do report time and again koma the problem is yet to be solved once and for all

Health threat in Area 36

14-Dec-2016 | 16:23

Am Moses from Area 36, mine is a concern that at Phwetekere market where they sell chicken parts there is great lack of hygiene, whose role is it to supervise and or take action on this. Actually at times these people even sell nkhuku zowola. What is the responsibility of the City Council on this?

Tili pa Chiophyezo kuno ku Chikwawa

13-Dec-2016 | 10:45

Ndati ndidandaule kui kuno ku Chikwawa tili pa chiophyezo chifukwa pa police unit yathu pano mwezi ukutha popanda anthu. omwe adalipo tidamva kuti adawapanga transfer koma olowa m'malo mwao sadabwere mpaka lero

Burst water pipe Chinyonga *RESOLVED*

11-Dec-2016 | 17:03

There is a burst water pipe off Chinyonga stage. Water is spilling out heavily.

Atiganizire Magetsi kuno ku Mulunguzi

10-Dec-2016 | 03:16

Magetsi-kuno Kumulunguzi Chilomoni,timati tipemphe nao ife a mpingo wa Mulunguzi seventh day adventist,kuti ngati kuli kotheka lero pa 10 december,a Escom atikomere mtima,asazatizimitsire magetsi,chifukwa tili ndi programe imene popanda magetsi sizayenda bwino,chonde tithandizeni

ESCOM Prepaid meter problem

09-Dec-2016 | 23:47

I am reporting from.area 49 Baghdad I have been calling trying to report a fault but escom has not come to fix the fault. We have been without electricity for a week now because the meter is damaged. This is the second time this has happened. Please assist!!!!

PREPAID ELECTRICITY UNITS SELLING POINTS

09-Dec-2016 | 16:25

Attached is a list of the selling points of prepaid electricity units for the Electricity Supply Corporation of Malawi as at 9 Dec, 2016

Pempho kuno kwa Jokala

09-Dec-2016 | 08:22

Tati tipemphe nawo kudzera pa Mzinda kuti atithandize kuno kwa Jokala ku Zomba, nkhani ya mseu, mseu wathu kuno sulibwino. Matias Kalemba

REDUCTION IN PRODUCTION DUE TO HEAVY SEDIMENTS AT THE LILONGWE WATER BOARD TREATMENT WORKS

08-Dec-2016 | 06:24

Lilongwe Water Board (LWB) would like to inform all its valued customers that following the on-set of the 2016/2017-rain season, water production to meet drinking standards is below the required capacity due to heavy siltation. This is usually the case with the first rains whereby the run-off brings with it heavy sediments that lodge at the intake reservoir. The sediments comes from the erosion of the bare catchment caused by wanton cutting of trees, poor agricultural practices and livelihood activities such as sand mining on the Lilongwe River banks. In spite of LWB’s efforts to manage wide variety of environmental issues, there has been an unprecedented increase to the sediment load for the past 10 years. The sediment lodging at the intake reservoir has also brought about a rapid reduction in the storage capacity of the reservoir in the past few years. The first rains also wash the sediment along, further causing challenges in the treatment process. However, the Board expects the situation to come under control after a few weeks of the rainfalls. Meanwhile, a limited Rationing Program has been commissioned. The Board regrets any inconvenience that this may cause. MANAGEMENT

Kuno ku Machinjiri kodi tidalakwanji

06-Dec-2016 | 04:21

Ndati ndifunse nawo kuti kodi kuno ku Machinjiri tidalakwanji? ma project ambiri adaima. chitsanzo project ya chipatala. nafe tili ndi ufulu wa chitukuko monga tidamvera. kotero chonde tiuzireniko atsogoleri athu. Mayi Wesike

Chitukuko ndi chotheka ngati pali kugwirirzana

04-Dec-2016 | 15:49

Ine filimon kuno kuchikuli. ndati tinenepo kuti MP akuyenela kugwilizana ndi khasala wake chitukuko chitheke

Pempho kuno ku Makata

03-Dec-2016 | 17:50

Kuno kwa T/A Makata ku Blantyre, bridge ya pa mtsinje wa Mlombozi inakokoloka chaka chatha,koma mpakana pano sunakonzedwe. Tiyembekezere kuti ukonzedwa liti,chifukwa nyengo yamvula ndiye yafikanso